Our Checklist for Masonry Wall Construction and its important.

 


The checklist in masonry wall construction is prepared to ensure that the masonry projects are constructed according to the higher standards. This is carried out by providing proper assistance for undergoing the review processes at the site.


The in-charge( our project manager) one of  his job is to prepare the masonry wall construction checklist. The checklist of item is also provided to the mason to review his work frequently so that the quality of work is assured from his side also.


The method of checklist preparation in masonry work ensures the confirmation of standards not only for the masonry work but also the workmanship standards.


How do we  Prepare Masonry Wall Construction Checklist?


Now masonry checklist, in general, will consist of three columns. The first column is for specifying the Item and the Work. The second column is for specifying the details of the respective work.


The third column is remarks or comments. This column designation will vary based on the specific requirements of the project item.






Mention and updating the availability of the materials available and yet to reach.

Preparation of the area for the preparation of the concrete or the material. This will involve the cleaning of the work zone.

Proper and appropriate bundling of the bricks. This will check improper placement and spoiling of brick materials.


Quality of bricks and the sand materials are mentioned once the test is conducted.

Check for over-burnt clays or under burnt clays.

Wetting of the bricks.

In case of clay bricks, they have to soaked before the work start.

The plumb level is checked.

Amount of salt content in the silt is checked.

Dead mortars are cleaned for new work and checked.

Racking and curing is checked – all vertical joints and horizontal joints have to be properly aligned.

Any chances of expansion or modification is checked.

Proper and accurate checking for pointing, plastering and finishing details.

Erection of frames – Alignment and position of the door is checked.

Checking the outline of each room – compared with the plan, checking the diagonal, the position of the windows and the openings.

Based on the diagonals and the dimension of the room, the first layer of the bricks is laid.

Joint must be checked for uniformity and thickness not greater than 10 to 12mm is maintained.

Mortar Mix

Water for mixing-storage of materials

Specified Mortar type

Check the mortar preparation and mix consistency

Mortar Mixing and Mortar Ration in Masonry Wall Construction

Application of Mortar- Proper filling of the joints

Filling the cavities and grouted cells

The joints in masonry must be properly cleared

Ensure the brickwork height to be made on a single day ( 1.5m)

Curing Details –Checked

After the work, the top of the wall is covered with wet jute bag after the end of every work

The curing has to be done for 7 to 10 days.

Comments

Popular posts from this blog

How do Mc Mushongo investment cc Effectively Manage Construction Supply Chain?

Solar window

How do Mc Mushongo Investment cc Improve Masonry Resistance Against Penetration of Water?